Include in Gang Run

Updated October 7, 2021

Ganging affects system calculations primarily by (but not exclusively) reducing the makereadies, inks and stock down to what is required by a single press sheet and then dividing the cost among the individual components or jobs based on the percentage allotted.

In both case, the processes that will be included in the gang run will need to be identified by selecting the "Include in Gang Run" checkbox. 

 

Prepress Process

 

Postpress Process