Makeready Spoilage (Postpress)

December 9, 2022

The value entered in the Makeready Spoilage field will add to the Input Quantity of the process based on the Costing Method.

 

 

 

If the MR Spoilage by Length option is checked then the spoilage is converted to absolute feet. Whereas, by default, the value in the Makeready Spoilage field would use the Input Quantity for the calculation and then multiply that value by the Costing Method.

 

Makeready Spoilage can either be accumulated into the previous process or not included based on the system setting Use Accumulating Spoilage for Postpress.