Use Effective Lots

Updated October 24, 2022

Applies to : Prepress Processes

Note:

This option requires that the Use Effective Lots, Calculate Qty using Page Count, Use Cost Grid options are selected AND there is at least 1 Grid Tier in the Cost Grid for the process to calculate correctly.

 

 

This option will calculate the Production Quantity based on the following;

Production Quantity = Component Header Qty / Cost Grid Tier Quantity x Component Page Count

 

The Production Time is calculated based on the Costing Method and the value in the Minutes per Unit field.

 

Costing Method

Production Time Formula

Minutes

Production Qty / 60 (1 hour in minutes)

Minutes per Unit

Production Qty / 60 (1 hour in minutes) * Minutes per Unit

Cost per Unit

Production Qty / 60 (1 hour in minutes) * Minutes per Unit

Cost per Square Inch

Production Qty / 60 (1 hour in minutes) * Minutes per Unit

 

The Production Cost is calculated based on the Costing Method.

 

Costing Method

Production Cost Formula

Minutes

Production Time * Hourly Rate

Minutes per Unit

Production Time * Hourly Rate

Cost per Unit

Production Qty * Cost per Unit

Cost per Square Inch

Production Qty * Cost per Unit