Calculate By Press Forms

Updated June 29, 2022

Applies to : Prepress Processes for Sheetfed and Web Components ONLY

Sheetfed Components

This option will calculate the prepress process Input Quantity based on the Number of Sides x # of Press Forms (calculated or with the Override Forms field in the Component Layout tab). Then the process will calculate Production Cost based on the Costing Method.

 

Note:

The option does not account for Imposition Style. For example; Work & Turn, Work  & Tumble and Work & Swirl will be calculated as having 2 sides and therefore will have 2 times all calculation even though they use the same plates.

 

Without using Cost Grid

Costing Method

Sides

Lots/Sig

Production Qty

(#Sides x # Lots)

Hourly Rate

Unit Cost

Mins/Unit

Production Time Calculation

Production Hours

Production Cost Calculation

Production Cost

Minutes

2

5

10

$60

$30

15

Prod Qty / 60 (1hour in Min)

0.17

Production Hours x Hourly Rate

$10.00

Minutes/Unit

2

2

10

$60

$30

15

Prod Qty / 60 (1hour in Mins) x Mins/Unit

2.50

Production Hours x Hourly Rate

$150.00

Cost/Unit

2

2

10

$60

$30

15

Prod Qty / 60 (1hour in Mins) x Mins/Unit

2.50

Prod Qty x Unit Cost x 2

$300.00

Cost/Sq Inch

2

2

10

$60

$30

15

Prod Qty / 60 (1hour in Mins) x Mins/Unit

2.50

 

Prod Qty x Unit Cost x 2

$300.00

 

With the option Use Cost Grid checked the Unit Cost will be determined by the Grid Tiers.

 

 

By default the system calculates the # of Press Forms automatically. However the user may opt to change the result by entering a value into the Override Press Forms field.

 

Sheetfed - Override Press Forms

 

Web Components

Web Components are calculated solely on the value entered into the # of Signatures field or through the Override Press Forms value if it is greater than 0.

 

Web - Override Press Forms