Updated October 24, 2022
When the system determines that there is a roll change required it will add time to the press production time based on the Minutes/Roll Change. The Waste/Roll Change calculates the additional material required to perform the roll change.
The extra material quantity will be based on the Material Costing Method. For example; if the material has a Costing Method of CWT the additional waste will be calculated based on the additional weight required.